Skip to main content
SinterWorks Logo
SinterWorks PM

PM Material Comparator

Compare material grades side by side and estimate your part costs

Not sure which grade fits your design? Shortlist candidates with the tools below, then validate them against the powder metallurgy DFM guide to confirm wall thickness, tolerances, and compaction feasibility before you commit to tooling.

Material Comparator

Compare up to 4 powder metallurgy materials side by side

Quick Cost Estimator

Approximate pricing for budget planning only

100g

Estimated Costs

Unit Price$33.750
Total Order (20,000 pcs)$675,000

Tooling (one-time)$12,000
Production Lead Time4-6 weeks
Samples2-3 weeks for first article samples
This is a rough estimate for budgeting. Actual pricing requires a formal quote based on drawings and specifications.
Get Accurate Quote

How PM Parts Are Made

Our end-to-end powder metallurgy manufacturing process, from raw powder to finished precision components

Step 1

Powder Blending

Base metal powders are precisely blended with alloying elements (copper, nickel, graphite) and lubricants. Particle size and composition are controlled for consistent flow and compaction behavior.

Step 2

Compacting

Blended powder is fed into precision tooling and compacted under 200-800 MPa pressure. Hydraulic presses (up to 800T) form the 'green' part to near-net shape with controlled density distribution.

Step 3

Sintering

Green parts are heated to ~1,120°C in controlled-atmosphere furnaces. Metal particles bond through diffusion, eliminating porosity and achieving 90-98% theoretical density. Belt speeds are calibrated for optimal grain structure.

Step 4

Sizing & Coining

Sintered parts are re-pressed in precision sizing dies to achieve GB6-GB9 gear tolerances. Coining can densify surfaces for improved fatigue resistance and dimensional accuracy.

Step 5

Secondary Operations

Heat treatment (carburizing, carbonitriding, induction hardening), CNC machining, steam treatment, oil impregnation, and surface finishing as required by the application specification.

Step 6

Inspection & Delivery

CMM dimensional verification, gear testing, metallurgical analysis, and PPAP documentation. Parts are packaged per export standards and shipped globally within 4-6 weeks of production order.

Need PM material advice?

Chat with our expert — free & instant